Pages that link to "Item:Q2343079"
From MaRDI portal
The following pages link to Bi-objective single machine scheduling problem with stochastic processing times (Q2343079):
Displaying 3 items.
- Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures (Q1688445) (← links)
- A robust optimization approach for the unrelated parallel machine scheduling problem (Q2701168) (← links)
- A stochastic approach for the single-machine scheduling problem to minimize total expected cost with client-dependent tardiness costs (Q6048180) (← links)