Pages that link to "Item:Q2367376"
From MaRDI portal
The following pages link to Minimizing variation of production rates in just-in-time systems: A survey (Q2367376):
Displaying 50 items.
- Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets (Q297414) (← links)
- Minimising maximum response time (Q336510) (← links)
- Level scheduling under limited resequencing flexibility (Q539476) (← links)
- On the part inventory model sequencing problem: complexity and beam search heuristic (Q633549) (← links)
- An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain (Q877048) (← links)
- Simultaneous optimization of classical objectives in JIT scheduling (Q879282) (← links)
- Algorithms for the car sequencing and the level scheduling problem (Q880539) (← links)
- Response time variability (Q880584) (← links)
- Improvement of earliness and lateness by postponement on an automotive production line (Q930141) (← links)
- Solving the car sequencing problem via branch \& bound (Q932220) (← links)
- Solving the response time variability problem by means of a psychoclonal approach (Q972638) (← links)
- Level scheduling for batched JIT supply (Q973058) (← links)
- Sequencing mixed-model assembly lines to minimize part inventory cost (Q991825) (← links)
- Sequencing mixed-model assembly lines: survey, classification and model critique (Q1011163) (← links)
- The product rate variation problem and its relevance in real world mixed-model assembly lines (Q1015006) (← links)
- Solving the response time variability problem by means of a genetic algorithm (Q1039773) (← links)
- Mathematical programming modeling of the response time variability problem (Q1042486) (← links)
- Heuristics and exact algorithms for solving the Monden problem (Q1266568) (← links)
- A simple approach to the product rate variation problem via axiomatics (Q1273090) (← links)
- Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging (Q1278361) (← links)
- Parametric methods of apportionment, rounding and production (Q1296499) (← links)
- A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process (Q1341405) (← links)
- Modelling and solving the production rate variation problem (PRVP) (Q1383316) (← links)
- The maximum deviation just-in-time scheduling problem. (Q1421459) (← links)
- Human factor policy testing in the sequencing of manual mixed model assembly lines. (Q1422380) (← links)
- Note on cyclic sequences in the product rate variation problem (Q1577992) (← links)
- Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages (Q1578003) (← links)
- A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines (Q1590816) (← links)
- Decentralized reactive Kanban system (Q1604069) (← links)
- The multi-objective assembly line worker integration and balancing problem of type-2 (Q1652274) (← links)
- Advanced constraint propagation for the combined car sequencing and level scheduling problem (Q1782169) (← links)
- A comment on ``A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems'' (Q1890955) (← links)
- Exact and meta-heuristic approaches for the production leveling problem (Q2163752) (← links)
- Integer programming models versus advanced planning business software for a multi-level mixed-model assembly line problem (Q2201319) (← links)
- Webster sequences, apportionment problems, and just-in-time sequencing (Q2243136) (← links)
- Scheduling just-in-time part supply for mixed-model assembly lines (Q2275595) (← links)
- Hyper-heuristic approaches for the response time variability problem (Q2275609) (← links)
- Interactive bicriterion decision support for a large scale industrial scheduling system (Q2347596) (← links)
- A branch and bound algorithm for the response time variability problem (Q2434314) (← links)
- Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem (Q2571186) (← links)
- Output Rate Variation Problem: Some Heuristic Paradigms and Dynamic Programming (Q2974712) (← links)
- Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line (Q3019223) (← links)
- An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal (Q3163160) (← links)
- (Q3388238) (← links)
- A heuristic procedure for the automobile assembly-line sequencing problem considering multiple product options (Q3541179) (← links)
- Sequencing problem for a mixed-model assembly line in the Toyota production system (Q4671355) (← links)
- On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems (Q5168734) (← links)
- Multi-objective optimal scheduling of reconfigurable assembly line for cloud manufacturing (Q5268939) (← links)
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches (Q5385397) (← links)
- Sequence-to-customer goal with stochastic demands for a mixed-model assembly line (Q5438620) (← links)