Pages that link to "Item:Q2370333"
From MaRDI portal
The following pages link to Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach (Q2370333):
Displaying 13 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Integrated production and logistics planning: contract manufacturing and choice of air/surface transportation (Q319939) (← links)
- Cyclic-order neighborhoods with application to the vehicle routing problem with stochastic demand (Q439376) (← links)
- Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility (Q490371) (← links)
- A batch-oblivious approach for complex job-shop scheduling problems (Q1695012) (← links)
- Solving multi-objective parallel machine scheduling problem by a modified NSGA-II (Q1788959) (← links)
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations (Q1991311) (← links)
- Parallel machine scheduling with the total weighted delivery time performance measure in distributed manufacturing (Q2026991) (← links)
- A cumulative unmanned aerial vehicle routing problem approach for humanitarian coverage path planning (Q2116920) (← links)
- An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics (Q2273664) (← links)
- A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times (Q2285809) (← links)
- A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems (Q2327956) (← links)
- Minimization of maximum lateness on parallel machines with a single server and job release dates (Q6614640) (← links)