The following pages link to Eugene Levner (Q238068):
Displaying 12 items.
- An improved FPTAS for maximizing the weighted number of just-in-time jobs in a two-machine flow shop problem (Q398866) (← links)
- A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times (Q617517) (← links)
- Parametric algorithms for 2-cyclic robot scheduling with interval processing times (Q640307) (← links)
- Optimal bi-criterion planning of rescue and evacuation operations for marine accidents using an iterative scheduling algorithm (Q828853) (← links)
- Cyclic multiple-robot scheduling with time-window constraints using a critical path approach (Q856208) (← links)
- An improved approximation scheme for scheduling a maintenance and proportional deteriorating jobs (Q898702) (← links)
- A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case (Q1003678) (← links)
- A note on a quadratic algorithm for the 2-cyclic robotic scheduling problem (Q1034640) (← links)
- Cyclic scheduling in a robotic production line (Q1347600) (← links)
- An efficient bicriteria algorithm for stable robotic flow shop scheduling (Q1753515) (← links)
- On the existence of dominating 6-cyclic schedules in four-machine robotic cells (Q1754378) (← links)
- A polynomial algorithm for 2-degree cyclic robot scheduling (Q1869423) (← links)