Pages that link to "Item:Q2384844"
From MaRDI portal
The following pages link to Optimal batch sizing in a multi-stage production system with rework consideration (Q2384844):
Displaying 22 items.
- An economic production quantity model with non-synchronized screening and rework (Q272559) (← links)
- Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments (Q286196) (← links)
- A disruption recovery plan in a three-stage production-inventory system (Q337485) (← links)
- Quality risk prediction at a non-sampling station machine in a multi-product, multi-stage, parallel processing manufacturing system subjected to sequence disorder and multiple stream effects (Q383167) (← links)
- Optimal production run time for two-stage production system with imperfect processes and allowable shortages (Q441026) (← links)
- An inventory model for product life cycle with maturity stage and defective items (Q505115) (← links)
- Effects of imperfect products on lot sizing with work in process inventory (Q545981) (← links)
- Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers (Q958558) (← links)
- On optimal batch sizing in a multi-stage production system with rework consideration (Q1041995) (← links)
- A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering (Q1708531) (← links)
- A genetic algorithm for optimizing defective goods supply chain costs using JIT logistics and each-cycle lengths (Q1994471) (← links)
- Innovative maintenance problem in a two-stage production-inventory system with imperfect processes (Q2178315) (← links)
- The multi-stage multi-product batch-sizing problem in the steel industry (Q2287574) (← links)
- Production lot sizing with quality screening and rework (Q2289337) (← links)
- Three-layer supply chain - A production-inventory model for reworkable items (Q2445208) (← links)
- Sustainable supply chain model for multi-stage manufacturing with partial backlogging under the fuzzy environment with the effect of learning in screening process (Q2669846) (← links)
- Optimal manufacturing batch size with rework for a finite-horizon and time-varying demand rates inventory model (Q2969966) (← links)
- An integrated model for optimisation of production and quality costs (Q3168934) (← links)
- (Q3384764) (← links)
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items (Q5172467) (← links)
- Hybrid flow-shop manufacturing network reliability optimization using genetic algorithm and absorbing Markov chain (Q6072716) (← links)
- Optimization with uncertainties: a scheduling example (Q6090379) (← links)