Pages that link to "Item:Q2426080"
From MaRDI portal
The following pages link to Due-date assignment and maintenance activity scheduling problem (Q2426080):
Displaying 23 items.
- Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time (Q433105) (← links)
- Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties (Q548379) (← links)
- Single machine scheduling with multiple common due date assignment and aging effect under a deteriorating maintenance activity consideration (Q741381) (← links)
- Scheduling problems with a weight-modifying-activity (Q828829) (← links)
- A note: Common due date assignment for a single machine scheduling with the rate-modifying activity (Q954028) (← links)
- Scheduling a maintenance activity and due-window assignment on a single machine (Q1010256) (← links)
- A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration (Q1037697) (← links)
- Single machine scheduling with resource allocation and learning effect considering the rate-modifying activity (Q1667833) (← links)
- A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity (Q1762115) (← links)
- Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance (Q1926630) (← links)
- Multitasking scheduling problems with deterioration effect (Q1992785) (← links)
- Two-agent single-machine scheduling with assignable due dates (Q2250186) (← links)
- Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance (Q2379661) (← links)
- Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization (Q2402113) (← links)
- Scheduling with due date assignment under special conditions on job processing (Q2434296) (← links)
- Single-machine common flow allowance scheduling with job-dependent aging effects and a deteriorating maintenance activity (Q2448206) (← links)
- SCHEDULING POSITION-BASED DETERIORATING JOBS WITH MULTIPLE RATE-MODIFYING ACTIVITIES AND PAST-SEQUENCE-DEPENDENT DELIVERY TIMES (Q2875636) (← links)
- SINGLE MACHINE SCHEDULING WITH A LEARNING EFFECT AND A RATE-MODIFYING ACTIVITY (Q3174015) (← links)
- Scheduling a maintenance activity on parallel identical machines (Q3621910) (← links)
- COMMON DUE-WINDOW ASSIGNMENT AND SCHEDULING OF JOB-DEPENDENT DETERIORATING JOBS AND MULTIPLE DETERIORATING MAINTENANCE ACTIVITIES (Q5411729) (← links)
- Single‐machine common flow allowance scheduling with aging effect, resource allocation, and a rate‐modifying activity (Q5744000) (← links)
- Multitasking scheduling with multiple rate‐modifying activities (Q6066633) (← links)
- Single-machine Scheduling Problems with Aging/Deteriorating Effect under an Optional Maintenance Activity Consideration (Q6102698) (← links)