Pages that link to "Item:Q2426522"
From MaRDI portal
The following pages link to Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling (Q2426522):
Displaying 11 items.
- A decomposition approach for the car resequencing problem with selectivity banks (Q339550) (← links)
- Level scheduling under limited resequencing flexibility (Q539476) (← links)
- On the part inventory model sequencing problem: complexity and beam search heuristic (Q633549) (← links)
- Level scheduling for batched JIT supply (Q973058) (← links)
- New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs (Q1044141) (← links)
- Truck scheduling in cross-docking terminals with fixed outbound departures (Q1944875) (← links)
- An exact solution approach for scheduling cooperative gantry cranes (Q1991263) (← links)
- Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system (Q2286964) (← links)
- GRASP with path relinking for a multiple objective sequencing problem for a mixed-model assembly line (Q3055271) (← links)
- An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal (Q3163160) (← links)
- Robust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity duration (Q6090155) (← links)