Pages that link to "Item:Q2434254"
From MaRDI portal
The following pages link to Scheduling jobs on parallel machines to minimize a regular step total cost function (Q2434254):
Displaying 13 items.
- Integrated production and logistics planning: contract manufacturing and choice of air/surface transportation (Q319939) (← links)
- Performance guarantees for a scheduling problem with common stepwise job payoffs (Q476886) (← links)
- Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility (Q490371) (← links)
- Scheduling job families on non-identical parallel machines with time constraints (Q744650) (← links)
- Exact methods for order acceptance and scheduling on unrelated parallel machines (Q1725610) (← links)
- A constraint generation approach for two-machine shop problems with jobs selection (Q1751902) (← links)
- Heuristics for a flowshop scheduling problem with stepwise job objective function (Q1754167) (← links)
- Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty (Q2045022) (← links)
- A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints (Q2256319) (← links)
- Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook (Q2341393) (← links)
- An exact extended formulation for the unrelated parallel machine total weighted completion time problem (Q2400044) (← links)
- Single machine scheduling with delivery dates and cumulative payoffs (Q2434318) (← links)
- An improved decision support model for scheduling production in an engineer-to-order manufacturer (Q6097850) (← links)