Pages that link to "Item:Q2449373"
From MaRDI portal
The following pages link to Some results of the worst-case analysis for flow shop scheduling with a learning effect (Q2449373):
Displayed 12 items.
- Flowshop scheduling with a general exponential learning effect (Q336933) (← links)
- Permutation flowshop problems with bi-criterion makespan and total completion time objective and position-weighted learning effects (Q337503) (← links)
- Single machine group scheduling with time dependent processing times and ready times (Q726558) (← links)
- Scheduling identical jobs on uniform parallel machines under position-based learning effects (Q1637750) (← links)
- Bicriterion optimization for flow shop with a learning effect subject to release dates (Q1722948) (← links)
- Study on flow shop scheduling with sum-of-logarithm-processing-times-based learning effects (Q2008062) (← links)
- Scheduling problems with effects of deterioration and truncated job-dependent learning (Q2354204) (← links)
- Research on permutation flow shop scheduling problems with general position-dependent learning effects (Q2449372) (← links)
- Scheduling problem in seru production system considering DeJong's learning effect and job splitting (Q2673820) (← links)
- Proportionate flowshop scheduling with position-dependent weights (Q5059283) (← links)
- Scheduling with a position-weighted learning effect and job release dates (Q5059418) (← links)
- Research on <i>m</i>‐machine flow shop scheduling with truncated learning effects (Q6088136) (← links)