Pages that link to "Item:Q2463502"
From MaRDI portal
The following pages link to An evaluation of the adequacy of project network generators with systematically sampled networks (Q2463502):
Displaying 41 items.
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce (Q282236) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- An evolutionary approach for the nurse rerostering problem (Q632687) (← links)
- Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem (Q708169) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- On the characterization and generation of nurse scheduling problem instances (Q1027526) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs (Q1631504) (← links)
- Computing project makespan distributions: Markovian PERT networks revisited (Q1634063) (← links)
- An exact composite lower bound strategy for the resource-constrained project scheduling problem (Q1652587) (← links)
- An agency perspective for multi-mode project scheduling with time/cost trade-offs (Q1722976) (← links)
- A nearest neighbour extension to project duration forecasting with artificial intelligence (Q1751933) (← links)
- A buffer control method for top-down project control (Q1754043) (← links)
- Resource-constrained project scheduling with activity splitting and setup times (Q2003582) (← links)
- Using schedule risk analysis with resource constraints for project control (Q2028756) (← links)
- A new algorithm for resource-constrained project scheduling with breadth and depth of skills (Q2030541) (← links)
- A reduction tree approach for the discrete time/cost trade-off problem (Q2147020) (← links)
- The impact of a limited budget on the corrective action taking process (Q2189899) (← links)
- Using earned value management and schedule risk analysis with resource constraints for project control (Q2242244) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems (Q2327625) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)
- Going to the core of hard resource-constrained project scheduling instances (Q2664304) (← links)
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances (Q2668709) (← links)
- New summary measures and datasets for the multi-project scheduling problem (Q2670516) (← links)
- Impacts of synergies on software project scheduling (Q2673811) (← links)
- Project scheduling and equipment planning with random breakdowns (Q4578170) (← links)
- Work Package Sizing and Project Performance (Q4971582) (← links)
- A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem (Q5870371) (← links)
- Integrated time–cost tradeoff and resources leveling problems with allowed activity splitting (Q6066283) (← links)
- A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem (Q6106485) (← links)
- A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem (Q6106961) (← links)
- Project scheduling under the threat of catastrophic disruption (Q6112627) (← links)
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms (Q6164372) (← links)
- Preprocessing the discrete time-cost tradeoff problem with generalized precedence relations (Q6534414) (← links)
- A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian networks (Q6554647) (← links)
- Reducing the feasible solution space of resource-constrained project instances (Q6561212) (← links)
- An empirical project forecasting accuracy framework using project regularity (Q6581383) (← links)
- On the summary measures for the resource-constrained project scheduling problem (Q6581387) (← links)
- Solving a real-life multi-skill resource-constrained multi-project scheduling problem (Q6588468) (← links)