Pages that link to "Item:Q2464376"
From MaRDI portal
The following pages link to Rangen: A random network generator for activity-on-the-node networks (Q2464376):
Displaying 50 items.
- A genetic algorithm for the robust resource leveling problem (Q283265) (← links)
- Exact algorithms for single-machine scheduling with time windows and precedence constraints (Q310349) (← links)
- Finding stable flows in multi-agent networks under an equal-sharing policy (Q325426) (← links)
- Fast minimum float computation in activity networks under interval uncertainty (Q398844) (← links)
- Scheduling modular projects on a bottleneck resource (Q398901) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- Criticality analysis of activity networks under interval uncertainty (Q633555) (← links)
- Robust resource allocations in temporal networks (Q715076) (← links)
- A classification of predictive-reactive project scheduling procedures (Q835548) (← links)
- A random generator of resource-constrained multi-project network problems (Q964864) (← links)
- Parallel machine scheduling with precedence constraints and setup times (Q991370) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs (Q1631504) (← links)
- Computing project makespan distributions: Markovian PERT networks revisited (Q1634063) (← links)
- The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models (Q1634073) (← links)
- Finding an optimal Nash equilibrium to the multi-agent project scheduling problem (Q1707826) (← links)
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem (Q1723411) (← links)
- The preemptive stochastic resource-constrained project scheduling problem (Q1735185) (← links)
- A nearest neighbour extension to project duration forecasting with artificial intelligence (Q1751933) (← links)
- Capital- and resource-constrained project scheduling with net present value optimization (Q1752257) (← links)
- An effective heuristic for project scheduling with resource availability cost (Q1752859) (← links)
- A buffer control method for top-down project control (Q1754043) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- Moments and distribution of the net present value of a serial project (Q1754257) (← links)
- Sequential testing of \(n\)-out-of-\(n\) systems: precedence theorems and exact methods (Q1755382) (← links)
- Generating two-terminal directed acyclic graphs with a given complexity index by constraint logic programming (Q1764795) (← links)
- Project scheduling under uncertainty: survey and research potentials (Q1772834) (← links)
- Precedence theorems and dynamic programming for the single-machine weighted tardiness problem (Q1991104) (← links)
- Resource-constrained project scheduling with activity splitting and setup times (Q2003582) (← links)
- Incentive schemes for resolving Parkinson's law in project management (Q2028911) (← links)
- Nash equilibrium solutions in multi-agent project scheduling with milestones (Q2031069) (← links)
- Due-date quotation model for manufacturing system scheduling under uncertainty (Q2058567) (← links)
- Optimal crashing of an activity network with disruptions (Q2149579) (← links)
- The impact of a limited budget on the corrective action taking process (Q2189899) (← links)
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds (Q2215556) (← links)
- Maximizing the expected net present value in a project with uncertain cash flows (Q2239980) (← links)
- Using earned value management and schedule risk analysis with resource constraints for project control (Q2242244) (← links)
- Price of anarchy and price of stability in multi-agent project scheduling (Q2288992) (← links)
- A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search (Q2383848) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- Uniform random posets (Q2660856) (← links)
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances (Q2668709) (← links)
- New summary measures and datasets for the multi-project scheduling problem (Q2670516) (← links)
- Impacts of synergies on software project scheduling (Q2673811) (← links)
- Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times (Q2788529) (← links)
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (Q3163363) (← links)
- Robust Quadratic Programming with Mixed-Integer Uncertainty (Q3386756) (← links)
- Investigating a claim about resource complexity measure (Q3390764) (← links)
- Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations (Q3458826) (← links)
- Project scheduling and equipment planning with random breakdowns (Q4578170) (← links)