Pages that link to "Item:Q2467264"
From MaRDI portal
The following pages link to Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints (Q2467264):
Displaying 5 items.
- Robust optimization for the cyclic hoist scheduling problem (Q300031) (← links)
- A branch and bound algorithm for the cyclic job-shop problem with transportation (Q339670) (← links)
- A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times (Q617517) (← links)
- Parametric algorithms for 2-cyclic robot scheduling with interval processing times (Q640307) (← links)
- Switched max-plus linear-dual inequalities: cycle time analysis and applications (Q6544795) (← links)