Pages that link to "Item:Q2467268"
From MaRDI portal
The following pages link to Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times (Q2467268):
Displaying 22 items.
- Modelling and solving generalised operational surgery scheduling problems (Q342152) (← links)
- Optimization problem of allocating limited project resources with separable constraints (Q466415) (← links)
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective (Q744648) (← links)
- Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results (Q744660) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- A branch and bound algorithm for project scheduling problem with spatial resource constraints (Q1666182) (← links)
- Heuristics for periodical batch job scheduling in a MapReduce computing framework (Q1750408) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)
- Resource-constrained project scheduling with activity splitting and setup times (Q2003582) (← links)
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers (Q2076410) (← links)
- Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem (Q2120134) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation (Q2336415) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Multi-project scheduling problem under shared multi-skill resource constraints (Q2701180) (← links)
- Comparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing Rates (Q3188762) (← links)
- Local search approaches for the test laboratory scheduling problem with variable task grouping (Q6090219) (← links)
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem (Q6106590) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)