Pages that link to "Item:Q2480802"
From MaRDI portal
The following pages link to Optimizing the landside operation of a container terminal (Q2480802):
Displaying 11 items.
- Development and simulation analysis of real-time yard crane control systems for seaport container transshipment terminals (Q841594) (← links)
- Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal (Q959522) (← links)
- Online rules for container stacking (Q989634) (← links)
- Scheduling automated triple cross-over stacking cranes in a container yard (Q989636) (← links)
- Discrete time model and algorithms for container yard crane scheduling (Q1027603) (← links)
- Crane scheduling in railway yards: an analysis of computational complexity (Q1707828) (← links)
- Scheduling cooperative gantry cranes with seaside and landside jobs (Q1744241) (← links)
- Storage yard operations in container terminals: literature overview, trends, and research directions (Q2256283) (← links)
- Gantry crane and shuttle car scheduling in modern rail-rail transshipment yards (Q2362173) (← links)
- Solving the single crane scheduling problem at rail transshipment yards (Q2422744) (← links)
- The assignment of storage locations to containers for a container stack (Q3655564) (← links)