Pages that link to "Item:Q2485226"
From MaRDI portal
The following pages link to A fast tabu search algorithm for the group shop scheduling problem (Q2485226):
Displayed 8 items.
- Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements (Q342448) (← links)
- Optimising a coal rail network under capacity constraints (Q656055) (← links)
- Solving scheduling problems from high-level models (Q657573) (← links)
- Group shops scheduling with makespan criterion subject to random release dates and processing times (Q733535) (← links)
- Scheduling trains as a blocking parallel-machine job shop scheduling problem (Q1017462) (← links)
- Group-shop scheduling with sequence-dependent set-up and transportation times (Q1634110) (← links)
- A hybrid metaheuristic algorithm to optimise a real-world robotic cell (Q1652331) (← links)
- An effective heuristic algorithm for the partial shop scheduling problem (Q1652579) (← links)