Pages that link to "Item:Q2503084"
From MaRDI portal
The following pages link to A complex time based construction heuristic for batch scheduling problems in the chemical industry (Q2503084):
Displaying 3 items.
- MILP-based campaign scheduling in a specialty chemicals plant: a case study (Q1017962) (← links)
- A sustainable aggregate production planning model for the chemical process industry (Q1652621) (← links)
- On the integration of diverging material flows into resource-constrained project scheduling (Q2160494) (← links)