Pages that link to "Item:Q2629719"
From MaRDI portal
The following pages link to Lead time considerations for the multi-level capacitated lot-sizing problem (Q2629719):
Displayed 7 items.
- A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem (Q319274) (← links)
- Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demand (Q323539) (← links)
- Classification and literature review of integrated lot-sizing and cutting stock problems (Q724044) (← links)
- The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model (Q1664892) (← links)
- Distance and matching-induced search algorithm for the multi-level lot-sizing problem with substitutable bill of materials (Q1737490) (← links)
- Alternative mathematical models and solution approaches for lot-sizing and scheduling problems in the brewery industry: analyzing two different situations (Q1993026) (← links)
- Simultaneous lotsizing and scheduling problems: a classification and review of models (Q2362236) (← links)