Pages that link to "Item:Q2629739"
From MaRDI portal
The following pages link to Two faster algorithms for coordination of production and batch delivery: a note (Q2629739):
Displaying 3 items.
- Integrated production and delivery on parallel batching machines (Q320081) (← links)
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence (Q1702665) (← links)
- Just-in-time logistics for far-distant suppliers: scheduling truck departures from an intermediate cross-docking terminal (Q1703454) (← links)