Pages that link to "Item:Q2643723"
From MaRDI portal
The following pages link to A mixed integer programming formulation for the total flow time single machine robust scheduling problem with interval data (Q2643723):
Displayed 6 items.
- Approximating a two-machine flow shop scheduling under discrete scenario uncertainty (Q439320) (← links)
- Scheduling with uncertainties on new computing platforms (Q535305) (← links)
- Minimizing total weighted completion time with uncertain data: a stability approach (Q612208) (← links)
- A 2-approximation algorithm for interval data minmax regret sequencing problems with the total flow time criterion (Q943795) (← links)
- Min-max and min-max regret versions of combinatorial optimization problems: A survey (Q1014933) (← links)
- Minimizing total weighted flow time under uncertainty using dominance and a stability box (Q1762112) (← links)