Pages that link to "Item:Q2668716"
From MaRDI portal
The following pages link to A hybrid multi-objective approach for real-time flexible production scheduling and rescheduling under dynamic environment in Industry 4.0 context (Q2668716):
Displaying 4 items.
- Optimising the flight turnaround schedules: an improved sliding time windows approach based on MILP and CP models (Q6065625) (← links)
- Manufacturing rescheduling after crisis or disaster-caused supply chain disruption (Q6106575) (← links)
- Dynamic shop-floor scheduling using real-time information: a case study from the thermoplastic industry (Q6109347) (← links)
- Enhancing stability and robustness in online machine shop scheduling: a multi-agent system and negotiation-based approach for handling machine downtime in industry 4.0 (Q6565395) (← links)