Pages that link to "Item:Q2726429"
From MaRDI portal
The following pages link to The resource constrained project scheduling problem with multiple crashable modes: An exact solution method (Q2726429):
Displaying 10 items.
- A float-path theory and its application to the time-cost tradeoff problem (Q305477) (← links)
- A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations (Q337079) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- PSPLIB -- a project scheduling problem library (Q1278481) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- Progress payments in project scheduling problems. (Q1812008) (← links)
- The construction of stable project baseline schedules (Q1877894) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)