The following pages link to Chunhsiung Lan (Q2748807):
Displayed 17 items.
- (Q2748808) (← links)
- Two-stage production plan of probabilistic market demand with unreliable machines and obtainable working hour capacity (Q2780829) (← links)
- Forecast cost budget of material ordering and inventory through the price change rate (Q2782301) (← links)
- (Q3081957) (← links)
- A modularized forecasting tool for ordering/inventory cost (Q3147064) (← links)
- (Q3521009) (← links)
- (Q3579812) (← links)
- Achieving optimal design of the production line with obtainable resource capacity (Q4452819) (← links)
- DYNAMIC MACHINING PROJECT CONTROL MODEL UNDER ORDER QUANTITY AND DEADLINE CONSTRAINTS (Q4483736) (← links)
- On a comparison of objective function in optimal design of flexible production line with the unreliable machines (Q4522306) (← links)
- DYNAMIC PRODUCTION PLAN OF PROBABILISTIC MARKET DEMAND AND FIXED SELLING TIME WITH UNRELIABLE MACHINES AND OBTAINABLE WORKING HOUR CAPACITY (Q4808312) (← links)
- Dynamic production control for determined quantity and deadline (Q4812283) (← links)
- Determining in-house/outsourcing activities of hi-tech project to seek ROS maximization (Q5293430) (← links)
- The control of a conveyor under the economical aspect (Q5307746) (← links)
- Estimation of sensitive quantitative characteristics in randomized response sampling (Q5480408) (← links)
- Model, analysis and application of employee assignment for quick service restaurant (Q5480418) (← links)
- The control of a serial-capacitated production line for cost optimization (Q5691681) (← links)