Pages that link to "Item:Q2783988"
From MaRDI portal
The following pages link to Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources (Q2783988):
Displaying 16 items.
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches (Q857326) (← links)
- Capacitated lot-sizing with extensions: a review (Q926571) (← links)
- Lagrangean relaxation based heuristics for lot sizing with setup times (Q953424) (← links)
- A cross entropy-lagrangean hybrid algorithm for the multi-item capacitated lot-sizing problem with setup times (Q954053) (← links)
- A heuristic approach for big bucket multi-level production planning problems (Q958084) (← links)
- Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers (Q958558) (← links)
- Finite horizon planning with fixed-interval deliveries and no shortage (Q998721) (← links)
- Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic (Q1010258) (← links)
- MIP formulations and heuristics for two-level production-transportation problems (Q1761227) (← links)
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs (Q1781573) (← links)
- A computational analysis of lower bounds for big bucket production planning problems (Q1935570) (← links)
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches (Q2379665) (← links)
- Heuristic algorithms for dynamic capacitated lotsizing for production flow networks with setup times (Q2477097) (← links)
- Single item lot sizing problems (Q2566041) (← links)
- Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over (Q3636786) (← links)
- METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES (Q5315988) (← links)