Pages that link to "Item:Q2795170"
From MaRDI portal
The following pages link to Two-machine flow shop scheduling integrated with preventive maintenance planning (Q2795170):
Displaying 2 items.
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314) (← links)
- Optimal maintenance policy incorporating system level and unit level for mechanical systems (Q5027598) (← links)