Pages that link to "Item:Q296867"
From MaRDI portal
The following pages link to Total completion time with makespan constraint in no-wait flowshops with setup times (Q296867):
Displaying 11 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan (Q1750472) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- Dynamic facility layout problem based on open queuing network theory (Q1751845) (← links)
- Scheduling with time-of-use costs (Q1755384) (← links)
- A numerical method for interval multi-objective mixed-integer optimal control problems based on quantum heuristic algorithm (Q2150758) (← links)
- No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan (Q2284308) (← links)
- Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time (Q2629637) (← links)
- Shop scheduling in manufacturing environments: a review (Q6060656) (← links)
- A memetic algorithm for restoring feasibility in scheduling with limited makespan (Q6177176) (← links)
- An efficient iterated greedy algorithm for a multi-objective no-wait flow shop problem with sequence dependent setup times (Q6489312) (← links)