The following pages link to Dismantle or remanufacture? (Q296990):
Displaying 6 items.
- Optimisation of integrated reverse logistics networks with different product recovery routes (Q296710) (← links)
- Production planning in a three-stock reverse-logistics system with deteriorating items under a periodic review policy (Q898729) (← links)
- Policies for inventory models with product returns forecast from past demands and past sales (Q2173120) (← links)
- Bricks vs. clicks: which is better for marketing remanufactured products? (Q2630096) (← links)
- The role of part failure rates asymmetry and spare part proprietariness on remanufacturing decision making (Q6113319) (← links)
- Design of a multi echelon product recovery embeded reverse logistics network for multi products and multi periods (Q6170575) (← links)