Pages that link to "Item:Q2970392"
From MaRDI portal
The following pages link to Tropical optimization problems in time-constrained project scheduling (Q2970392):
Displaying 7 items.
- Algebraic solution of a problem of optimal project scheduling in project management (Q2038518) (← links)
- Solving a tropical optimization problem with application to optimal scheduling (Q2282764) (← links)
- On the rank-one approximation of positive matrices using tropical optimization methods (Q2289366) (← links)
- Algebraic solution of tropical optimization problems via matrix sparsification with application to scheduling (Q2397043) (← links)
- Algebraic solution to optimal scheduling problems taking into account the scheduled start time of jobs in projects (Q2688535) (← links)
- Derivatives of triangular, Toeplitz, circulant matrices and of matrices of other forms over semirings (Q5002458) (← links)
- Minimizing maximum lateness in two-stage projects by tropical optimization (Q5878535) (← links)