The following pages link to James D. Blocher (Q297183):
Displayed 8 items.
- Optimal single machine scheduling of products with components and changeover cost (Q297186) (← links)
- Minimizing customer order lead-time in a two-stage assembly supply chain (Q940914) (← links)
- A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem (Q1278236) (← links)
- An efficient network-based formulation for sequence dependent setup scheduling on parallel identical machines (Q2256404) (← links)
- A note on the Coffman-Sethi bound for LPT scheduling (Q2356126) (← links)
- The Changeover Scheduling Problem with Time and Cost Considerations: Analytical Results and a Forward Algorithm (Q2770123) (← links)
- (Q3971305) (← links)
- (Q5687639) (← links)