Pages that link to "Item:Q3116727"
From MaRDI portal
The following pages link to Three Scheduling Algorithms Applied to the Earth Observing Systems Domain (Q3116727):
Displayed 16 items.
- A two-phase scheduling method with the consideration of task clustering for Earth observing satellites (Q336398) (← links)
- Optimization-based scheduling for the single-satellite, multi-ground station communication problem (Q337472) (← links)
- A pure proactive scheduling algorithm for multiple Earth observation satellites under uncertainties of clouds (Q342441) (← links)
- A Lagrangian heuristic for satellite range scheduling with resource constraints (Q716351) (← links)
- Reconfiguration of satellite orbit for cooperative observation using variable-size multi-objective differential evolution (Q726216) (← links)
- Graph colouring approaches for a satellite range scheduling problem (Q835607) (← links)
- A heuristic for the multi-satellite, multi-orbit and multi-user management of Earth observation satellites (Q856269) (← links)
- On the tractability of satellite range scheduling (Q2017833) (← links)
- Solving the swath segment selection problem through Lagrangean relaxation (Q2456644) (← links)
- AFSCN scheduling: how the problem and solution have evolved (Q2473179) (← links)
- Optimal spacecraft support in remote sensing missions (Q2477094) (← links)
- CP methods for scheduling and routing with~time-dependent task costs (Q2513747) (← links)
- Operational fixed job scheduling problem under spread time constraints: a branch-and-price algorithm (Q3055658) (← links)
- Working time constraints in operational fixed job scheduling (Q3163130) (← links)
- A fixed job scheduling problem with machine-dependent job weights (Q3183761) (← links)
- Spread time considerations in operational fixed job scheduling (Q3432669) (← links)