Pages that link to "Item:Q3156680"
From MaRDI portal
The following pages link to Setup cost reduction in (<i>Q, r</i>) policy with lot size, setup time and lead-time interactions (Q3156680):
Displayed 9 items.
- Optimal ordering policy and coordination mechanism of a supply chain with controllable lead-time-dependent demand forecast (Q410599) (← links)
- Optimal reorder point inventory models with variable lead time and backorder discount considerations (Q1876147) (← links)
- A periodic review policy for a coordinated single vendor-multiple buyers supply chain with controllable lead time and distribution-free approach (Q2240673) (← links)
- An integrated inventory model with controllable lead time and distribution-free demand (Q3103160) (← links)
- A note on defective units in an inventory model with sub-lot sampling inspection for variable lead-time demand with the mixture of free distributions (Q3158873) (← links)
- A novel approach to safety stock management in a coordinated supply chain with controllable lead time using present value (Q4628724) (← links)
- A continuous review inventory model with the controllable production rate of the manufacturer (Q4670677) (← links)
- An optimal inventory model with interaction of lot size, production rate and lead-time in a fuzzy back-order system (Q5242355) (← links)
- Controlling lead times and minor ordering costs in the joint replenishment problem with stochastic demands under the class of cyclic policies (Q6070425) (← links)