Pages that link to "Item:Q3157790"
From MaRDI portal
The following pages link to New computational results on the discrete time/cost trade-off problem in project networks (Q3157790):
Displaying 18 items.
- A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations (Q337079) (← links)
- Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem (Q708169) (← links)
- The discrete time/cost trade-off problem: Extensions and heuristic procedures (Q835571) (← links)
- A heuristic procedure for solving the dynamic probabilistic project expediting problem (Q948658) (← links)
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations (Q991368) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem (Q992657) (← links)
- A new path-based cutting plane approach for the discrete time-cost tradeoff problem (Q993703) (← links)
- Discrete time/cost trade-off problem: a decomposition-based solution algorithm for the budget version (Q1040964) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search. (Q1427560) (← links)
- Improving project cost estimation by taking into account managerial flexibility (Q1590029) (← links)
- An agency perspective for multi-mode project scheduling with time/cost trade-offs (Q1722976) (← links)
- New computational results for the discrete time/cost trade-off problem with time-switch constraints (Q1772840) (← links)
- A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project (Q2076443) (← links)
- A reduction tree approach for the discrete time/cost trade-off problem (Q2147020) (← links)
- Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations (Q3458826) (← links)