Pages that link to "Item:Q3163328"
From MaRDI portal
The following pages link to Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups (Q3163328):
Displaying 7 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Effect of solution representations on tabu search in scheduling applications (Q336636) (← links)
- Flow shop batching and scheduling with sequence-dependent setup times (Q490328) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- Family scheduling with batch availability in flow shops to minimize makespan (Q1743654) (← links)
- A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems (Q2029256) (← links)
- Minimizing shifts for personnel task scheduling problems: a three-phase algorithm (Q2514834) (← links)