Pages that link to "Item:Q320746"
From MaRDI portal
The following pages link to Production phase and ultimate pit limit design under commodity price uncertainty (Q320746):
Displaying 4 items.
- A dynamic-material-value-based decomposition method for optimizing a mineral value chain with uncertainty (Q1751684) (← links)
- Lexicographic goal programming approach for a short-term mining planning problem (Q6048508) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- Optimization of open-pit mine design and production planning with an improved floating cone algorithm (Q6173792) (← links)