Pages that link to "Item:Q3356081"
From MaRDI portal
The following pages link to Scheduling of Project Networks by Job Assignment (Q3356081):
Displaying 45 items.
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce (Q282236) (← links)
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling (Q421082) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (Q657259) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- A neurogenetic approach for the resource-constrained project scheduling problem (Q709106) (← links)
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems (Q709108) (← links)
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q859913) (← links)
- Scheduling projects with limited number of preemptions (Q1025235) (← links)
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (Q1266547) (← links)
- Multi-level, single-machine lot sizing and scheduling (with initial inventory) (Q1266652) (← links)
- Audit scheduling with overlapping activities and sequence-dependent setup costs (Q1278577) (← links)
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application (Q1291582) (← links)
- Distribution requirements and compactness constraints in school timetabling (Q1291590) (← links)
- Heuristics for multimode scheduling problems with dedicated resources (Q1296081) (← links)
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (Q1296105) (← links)
- A new tabu search procedure for an audit-scheduling problem (Q1297694) (← links)
- On a paper by Christofides et al. for solving the multiple-resource constrained, single project scheduling problem (Q1331569) (← links)
- The job shop tardiness problem: A corrected model (Q1342655) (← links)
- An exact algorithm for project scheduling with multiple modes (Q1372766) (← links)
- Tabu search in audit scheduling (Q1609901) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)
- Justification and RCPSP: a technique that pays (Q1772841) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects (Q1841162) (← links)
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling (Q1909005) (← links)
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem (Q1992769) (← links)
- Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods) (Q2277354) (← links)
- Scheduling and staffing multiple projects with a multi-skilled workforce (Q2379671) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- Robust surgery loading (Q2464187) (← links)
- Meta-heuristics for stable scheduling on a single machine (Q2468477) (← links)
- A genetic algorithm for the resource constrained multi-project scheduling problem (Q2482793) (← links)
- An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem (Q3605435) (← links)
- Competitive methods for multi-level lot sizing and scheduling: tabu search and randomized regrets (Q4230222) (← links)
- Case-based reasoning and improved adaptive search for project scheduling (Q4487088) (← links)
- A classification scheme for integrated staff rostering and scheduling problems (Q5247703) (← links)
- A Survey of the Generalized Assignment Problem and Its Applications (Q6102818) (← links)
- A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q6102850) (← links)
- An integrated approach for allocation and scheduling-location problems on graphs (Q6543758) (← links)
- Solving a real-life multi-skill resource-constrained multi-project scheduling problem (Q6588468) (← links)