The following pages link to Nasser Salmasi (Q337060):
Displaying 5 items.
- Parallel machine scheduling problem with preemptive jobs and transportation delay (Q337061) (← links)
- Total flow time minimization in a flowshop sequence-dependent group scheduling problem (Q733546) (← links)
- A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties (Q2285347) (← links)
- Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem (Q2341222) (← links)
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups (Q2565776) (← links)