Pages that link to "Item:Q337585"
From MaRDI portal
The following pages link to Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate (Q337585):
Displaying 4 items.
- A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach (Q1730479) (← links)
- Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach (Q2241323) (← links)
- A simulation-optimization framework for generating dynamic dispatching rules for stochastic job shop with earliness and tardiness penalties (Q2669778) (← links)
- Maximizing the service level on the makespan in the stochastic flexible job-shop scheduling problem (Q6106559) (← links)