Pages that link to "Item:Q3391997"
From MaRDI portal
The following pages link to Multiproduct Systems with Both Setup Times and Costs: Fluid Bounds and Schedules (Q3391997):
Displaying 7 items.
- Maximum weight matching with hysteresis in overloaded queues with setups (Q285966) (← links)
- Prioritized customer order scheduling to maximize throughput (Q323536) (← links)
- On global near optimality of special periodic protocols for fluid polling systems with setups (Q504824) (← links)
- Dynamic interactive stabilization of the switching Kumar-Seidman system (Q1036949) (← links)
- Designs of optimal switching feedback decentralized control policies for fluid queueing networks (Q1925834) (← links)
- Energy-saving policies for temperature-controlled production systems with state-dependent setup times and costs (Q2023980) (← links)
- A Marginal Productivity Index Rule for Scheduling Multiclass Queues with Setups (Q3616980) (← links)