Pages that link to "Item:Q340257"
From MaRDI portal
The following pages link to Minimizing makespan in three-machine flow shops with deteriorating jobs (Q340257):
Displaying 33 items.
- A note on ''minimizing makespan in three machine flow shop with deteriorating jobs'' (Q342378) (← links)
- Single machine group scheduling with decreasing time-dependent processing times subject to release dates (Q470781) (← links)
- Due-window assignment scheduling in the proportionate flow shop setting (Q827100) (← links)
- Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines (Q828672) (← links)
- Three-machine flow shop scheduling with overlapping waiting time constraints (Q1628045) (← links)
- Unrelated parallel machines scheduling with deteriorating jobs and resource dependent processing times (Q1634027) (← links)
- Single machine common flow allowance scheduling with deteriorating jobs and a rate-modifying activity (Q1634141) (← links)
- Single machine past-sequence-dependent delivery times scheduling with general position-dependent and time-dependent learning effects (Q1667841) (← links)
- Single machine SLK/DIF due window assignment problem with learning effect and deteriorating jobs (Q1791483) (← links)
- Single-machine ready times scheduling with group technology and proportional linear deterioration (Q1991336) (← links)
- Improved algorithms for proportionate flow shop scheduling with due-window assignment (Q2069253) (← links)
- Two parallel-machine scheduling problems with function constraint (Q2187975) (← links)
- Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop (Q2241320) (← links)
- Flow shop scheduling problem with position-dependent processing times (Q2273687) (← links)
- Scheduling jobs with position and sum-of-processing-time based processing times (Q2278782) (← links)
- ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost (Q2284315) (← links)
- A review of four decades of time-dependent scheduling: main results, new topics, and open problems (Q2305016) (← links)
- Single-machine scheduling problems with precedence constraints and simple linear deterioration (Q2337543) (← links)
- Scheduling problems with effects of deterioration and truncated job-dependent learning (Q2354204) (← links)
- The single-machine total tardiness problem with unequal release times and a linear deterioration (Q2511712) (← links)
- A maintenance activity scheduling with time-and-position dependent deteriorating effects (Q2693623) (← links)
- Triage Scheduling Optimization for Mass Casualty and Disaster Response (Q2788521) (← links)
- Scheduling with Deteriorating Jobs and Non-Simultaneous Machine Available Times (Q2788530) (← links)
- Minimizing Makespan in Permutation Flow Shop Scheduling with Proportional Deterioration (Q2788531) (← links)
- Permutation Flow Shop Problem with Shortening Job Processing Times (Q2821099) (← links)
- MAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS (Q2873830) (← links)
- A NOTE ON "SCHEDULING PROBLEMS WITH THE EFFECTS OF DETERIORATION AND LEARNING" (Q2875625) (← links)
- A comparison of mixed-integer linear programming models for workforce scheduling with position-dependent processing times (Q5058834) (← links)
- Permutation flowshop scheduling with simple linear deterioration (Q5059195) (← links)
- Common Due Window Assignment Scheduling with Proportional Linear Deterioration Effects (Q5216798) (← links)
- Single Machine Two-Agent Scheduling with Deteriorating Jobs (Q5506754) (← links)
- Approaches to Solving Scheduling with Due-Window Assignment and Deterioration Effects (Q6053522) (← links)
- Optimization of scheduling problems with deterioration effects and an optional maintenance activity (Q6116026) (← links)