The following pages link to Hakan Gultekin (Q340277):
Displaying 12 items.
- Two-machine flowshop scheduling with flexible operations and controllable processing times (Q340278) (← links)
- Bicriteria robotic cell scheduling (Q835626) (← links)
- Scheduling in a three-machine robotic flexible manufacturing cell (Q869007) (← links)
- Pure cycles in flexible robotic cells (Q954029) (← links)
- Throughput optimization in two-machine flowshops with flexible operations (Q983633) (← links)
- Bicriteria robotic operation allocation in a flexible manufacturing cell (Q1040977) (← links)
- Cyclic scheduling of parts and robot moves in \(m\)-machine robotic cells (Q1652519) (← links)
- Robotic cell scheduling with operational flexibility (Q1765510) (← links)
- The location-allocation problem of drone base stations (Q2273669) (← links)
- Cyclic scheduling of a 2-machine robotic cell with tooling constraints (Q2503054) (← links)
- Scheduling in robotic cells: process flexibility and cell layout (Q3533187) (← links)
- 3-D Dynamic UAV Base Station Location Problem (Q5085461) (← links)