The following pages link to Seong-Woo Choi (Q342350):
Displayed 4 items.
- Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times (Q342351) (← links)
- Minimizing total tardiness on a two-machine re-entrant flowshop (Q1042154) (← links)
- Minimizing makespan on an \(m\)-machine re-entrant flowshop (Q2459401) (← links)
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop (Q5466727) (← links)