The following pages link to Joris van de Klundert (Q342460):
Displaying 20 items.
- Stochastic programming analysis and solutions to schedule overcrowded operating rooms in China (Q342461) (← links)
- A note on the integrality gap of an ILP formulation for the periodic maintenance problem (Q433120) (← links)
- (Q531463) (redirect page) (← links)
- Improving LTL truck load utilization on line (Q531465) (← links)
- Production planning problems in printed circuit board assembly (Q697574) (← links)
- A note on a motion control problem for a placement machine (Q991822) (← links)
- The assembly of printed circuit boards: A case with multiple machines and multiple board types (Q1278722) (← links)
- Cyclic scheduling in 3-machine robotic flow shops (Q1283916) (← links)
- (Q1593524) (redirect page) (← links)
- Cyclic scheduling in robotic flowshops (Q1593526) (← links)
- Eliminating transplant waiting time inequities -- with an application to kidney allocation in the USA (Q2060410) (← links)
- Modeling and solving the periodic maintenance problem (Q2488905) (← links)
- On the high multiplicity traveling salesman problem (Q2494812) (← links)
- A framework for the complexity of high-multiplicity scheduling problems (Q2569171) (← links)
- Basic scheduling problems with raw material constraints (Q3367034) (← links)
- Worst-case performance of approximation algorithms for tool management problems (Q4266753) (← links)
- (Q4343732) (← links)
- Cyclic Scheduling of Identical Parts in a Robotic Cell (Q4384095) (← links)
- Approximation algorithms for integer covering problems via greedy column generation (Q4846487) (← links)
- Multiplicity and complexity issues in contemporary production scheduling (Q5422015) (← links)