Pages that link to "Item:Q3483069"
From MaRDI portal
The following pages link to Scheduling Parts in a Combined Production-transportation Work Cell (Q3483069):
Displayed 17 items.
- Hybrid flowshop scheduling with interstage job transportation (Q489104) (← links)
- Machine scheduling with deliveries to multiple customer locations (Q707086) (← links)
- Flowshop scheduling with interstage job transportation (Q892841) (← links)
- Optimization of processing and delivery decisions involving third-party machines (Q1000038) (← links)
- Algorithms for sequencing robot activities in a robot-centered parallel- processor workcell (Q1207209) (← links)
- A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots (Q1265862) (← links)
- A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem (Q1278537) (← links)
- Machine scheduling with job delivery coordination (Q1876146) (← links)
- Scheduling a two-machine robotic cell: A solvable case (Q1897386) (← links)
- Coordinating multi-location production and customer delivery (Q1936790) (← links)
- On-line scheduling in a surface treatment system (Q1969840) (← links)
- Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times (Q2290581) (← links)
- The evolution of schematic representations of flow shop scheduling problems (Q2304109) (← links)
- Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time (Q2342682) (← links)
- Realistic two-stage flowshop batch scheduling problems with transportation capacity and times (Q2428924) (← links)
- Machine scheduling with transportation considerations (Q5932281) (← links)
- Makespan minimization for flow-shop problems with transportation times and a single robot (Q5946823) (← links)