Pages that link to "Item:Q3539889"
From MaRDI portal
The following pages link to Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information (Q3539889):
Displaying 4 items.
- Joint optimization of condition-based maintenance and production lot-sizing (Q323116) (← links)
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- Nonparametric estimation and bootstrap confidence intervals for the optimal maintenance time of a repairable system (Q1800066) (← links)
- Time and inventory dependent optimal maintenance policies for single machine workstations: an MDP approach (Q2355105) (← links)