Pages that link to "Item:Q356114"
From MaRDI portal
The following pages link to Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints (Q356114):
Displaying 9 items.
- Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate (Q337585) (← links)
- A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach (Q1730479) (← links)
- Solving multi-objective parallel machine scheduling problem by a modified NSGA-II (Q1788959) (← links)
- Extension of an algorithm for product mix problems with fuzzy conditions (Q1792307) (← links)
- Enhanced simulated annealing for solving aggregate production planning (Q1792731) (← links)
- Bi-objective parallel machine scheduling with additional resources during setups (Q2030593) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach (Q2241323) (← links)
- A research survey: review of flexible job shop scheduling techniques (Q2811943) (← links)