Pages that link to "Item:Q3737157"
From MaRDI portal
The following pages link to Optimal Policy for a Two-Stage Assembly System under Random Demand (Q3737157):
Displaying 12 items.
- Simultaneous coordination of order quantity and reorder point in a two-stage supply chain (Q547114) (← links)
- Approximations of lead-time distributions in an assemble-to-order system under a base-stock policy (Q709207) (← links)
- Optimal and heuristic policies for assemble-to-order systems with different review periods (Q724063) (← links)
- Materials coordination in stochastic multi-echelon systems (Q1278356) (← links)
- Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies (Q1303731) (← links)
- A performance bound on single cycle lot-sizing policies for an assembly system with stochastic demand (Q1318662) (← links)
- A typology and literature review on stochastic multi-echelon inventory models (Q1749506) (← links)
- Knowledge You Can Act on: Optimal Policies for Assembly Systems with Expediting and Advance Demand Information (Q2957462) (← links)
- Inventory policies for a make‐to‐order system with a perishable component and fixed ordering cost (Q3621920) (← links)
- Asymptotically Optimal Lagrangian Policies for Multi-Warehouse, Multi-Store Systems with Lost Sales (Q5031005) (← links)
- Recent developments in single product, discrete-time, capacitated production-inventory systems. (Q5955795) (← links)
- Synchronization in a two‐supplier assembly system: Combining a fixed lead‐time module with capacitated m<scp>ake‐to‐order</scp> production (Q6077483) (← links)