Pages that link to "Item:Q3775310"
From MaRDI portal
The following pages link to Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach (Q3775310):
Displaying 16 items.
- Optimal inspection policies for a scale (Q597371) (← links)
- Optimal inspection effort and scheduling for a manufacturing process with repair (Q1127131) (← links)
- Specialized inspection problems in serial production systems (Q1129930) (← links)
- Optimal inspection policies for a manufacturing station (Q1206597) (← links)
- Inspection sequencing and part scheduling for flexible manufacturing systems (Q1278391) (← links)
- Sequencing counts: a combined approach for sequencing and selecting costly unreliable off-line inspections (Q1761186) (← links)
- An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework (Q2393122) (← links)
- A polynomial time algorithm for solving a quality control Station configuration problem (Q2473038) (← links)
- Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance (Q3072346) (← links)
- Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework (Q3107242) (← links)
- Workflow analysis of production lines with complete inspection and rework loops (Q3168931) (← links)
- Layer modelling for the inspection allocation problem in re-entrant production systems (Q3369514) (← links)
- Quality control in a single state production system: open and closed loop policies (Q3490827) (← links)
- Optimal sequencing of production and inspection operations (Q4394192) (← links)
- Inspection resource assignment in a multistage manufacturing system with an inspection error model (Q4656114) (← links)
- Integrating inspection-policy design in assembly-line balancing (Q5385386) (← links)