Pages that link to "Item:Q3919433"
From MaRDI portal
The following pages link to Analysis of a Preference Order Assembly Line Problem (Q3919433):
Displaying 7 items.
- Multiobjective management of mining under water hazard by game theory (Q595510) (← links)
- Theory and applications of generalized dynamic programming: An overview (Q1119492) (← links)
- A classification of assembly line balancing problems (Q2371356) (← links)
- A versatile algorithm for assembly line balancing (Q2383104) (← links)
- A survey on problems and methods in generalized assembly line balancing (Q2569060) (← links)
- Stochastic assembly line balancing: general bounds and reliability-based branch-and-bound algorithm (Q2672079) (← links)
- A spreadsheet method for calculating work completion time probability distributions of paced or linked assembly lines (Q4807187) (← links)