Pages that link to "Item:Q3929394"
From MaRDI portal
The following pages link to A New Linear Programming Approach to the Cutting Stock Problem (Q3929394):
Displayed 21 items.
- Integrating process optimization and inventory planning in cutting-stock with skiving option: an optimization model and its application (Q706851) (← links)
- An algorithm for the two-dimensional assortment problem (Q759646) (← links)
- Cutting optimization of structural tubes to build agricultural light aircrafts (Q839788) (← links)
- An integer programming model for two- and three-stage two-dimensional cutting stock problems (Q976382) (← links)
- The stochastic trim-loss problem (Q1011257) (← links)
- Practical adaptations of the Gilmore-Gomory approach to cutting stock problems (Q1101335) (← links)
- A comparison of two optimization procedures for 1- and 1\(1/2\)-dimensional cutting stock problems (Q1101337) (← links)
- Composite stock cutting through simulated annealing (Q1197089) (← links)
- Knowledge based approach to the cutting stock problem (Q1197096) (← links)
- The cutting stock problem with mixed objectives: Two heuristics based on dynamic programming (Q1296373) (← links)
- Selection of stockplate characteristics and cutting style for two dimensional cutting stock situations (Q1825764) (← links)
- Optimal solutions for the cutting stock problem (Q1825768) (← links)
- LP models for bin packing and cutting stock problems (Q1847189) (← links)
- Heuristics for the integer one-dimensional cutting stock problem: A computational study (Q1919356) (← links)
- An iterative sequential heuristic procedure to a real-life 1.5-dimensional cutting stock problem (Q2433559) (← links)
- An improved typology of cutting and packing problems (Q2643945) (← links)
- An integrated cutting stock and sequencing problem (Q2643965) (← links)
- An approach to two-dimensional cutting stock problems (Q3753794) (← links)
- A note on handling residual lengths (Q3974424) (← links)
- Analysis and modelling of a production line in a corrugated box factory (Q4394294) (← links)
- List-scheduling and column-generations for scheduling of n job-groups with set up time and due date through m identical parallel machines to minimize makespan (Q5292944) (← links)