Pages that link to "Item:Q3989141"
From MaRDI portal
The following pages link to The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints (Q3989141):
Displaying 19 items.
- Scheduling multiple factory cranes on a common track (Q337056) (← links)
- A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags (Q872246) (← links)
- An evolutionary approach for the design and scheduling of electroplating facilities (Q928697) (← links)
- Combinatorial optimization models for production scheduling in automated manufacturing systems (Q1278813) (← links)
- Determining the optimal starting times in a cyclic schedule with a given route (Q1310046) (← links)
- Minimizing the fleet size with dependent time-window and single-track constraints (Q1317008) (← links)
- A bounding scheme for deriving the minimal cycle time of a single- transporter \(N\)-stage process with time-window constraints (Q1341993) (← links)
- Cyclic scheduling in a robotic production line (Q1347600) (← links)
- Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines (Q1761100) (← links)
- An analysis of cyclic scheduling problems in robot centered cells (Q1762114) (← links)
- Mean flow time minimization with given bounds of processing times (Q1887954) (← links)
- A solution for cyclic scheduling of multi-hoists without overlapping (Q2271830) (← links)
- One-dimensional vehicle scheduling with a front-end depot and non-crossing constraints (Q2454369) (← links)
- Machine scheduling with an availability constraint (Q2564885) (← links)
- AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM (Q3632031) (← links)
- An algorithm for hoist scheduling problems (Q4394213) (← links)
- Crane scheduling with time windows in circuit board production lines (Q4398967) (← links)
- Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach (Q4671265) (← links)
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows (Q5058816) (← links)