The following pages link to (Q3995531):
Displaying 50 items.
- A newsvendor inventory model with an emergency order to supply a non-increasing fraction of shortage (Q275045) (← links)
- Single machine scheduling with release and due date assignment to minimize the weighted number of late jobs (Q293435) (← links)
- Solving general multi-class closed queuing networks using parametric decomposition (Q336370) (← links)
- A mixed integer programming approach for the single machine problem with unequal release dates (Q337161) (← links)
- Online algorithms for scheduling unit length jobs on parallel-batch machines with lookahead (Q413308) (← links)
- Routing open shop and flow shop scheduling problems (Q421573) (← links)
- The incremental bullwhip effect of operational deviations in an arborescent supply chain with requirements planning (Q421669) (← links)
- An improved on-line algorithm for single parallel-batch machine scheduling with delivery times (Q423933) (← links)
- Optimal algorithms for online single machine scheduling with deteriorating jobs (Q442286) (← links)
- Crowdsourcing new product design on the web: an analysis of online designer platform service (Q460340) (← links)
- Optimizing busy time on parallel machines (Q476900) (← links)
- Online over time scheduling on parallel-batch machines: a survey (Q489147) (← links)
- Online scheduling on unbounded parallel-batch machines with incompatible job families (Q533882) (← links)
- Properties of optimal schedules in preemptive shop scheduling (Q628308) (← links)
- Scheduling and constraint propagation (Q697570) (← links)
- Inapproximability results for no-wait job shop scheduling. (Q703234) (← links)
- Minimizing makespan for a bipartite graph on a single processor with an integer precedence delay. (Q703281) (← links)
- Batching decisions for assembly production systems (Q703918) (← links)
- Linear programming models with planned lead times for supply chain operations planning (Q706867) (← links)
- A model for analyzing multi-channel distribution systems (Q706882) (← links)
- Minimizing total busy time in parallel scheduling with application to optical networks (Q708204) (← links)
- A best possible online algorithm for scheduling equal-length jobs on two machines with chain precedence constraints (Q714856) (← links)
- A cyclic versus flexible approach to materials ordering in make-to-order assembly (Q815325) (← links)
- A facility location model for logistics systems including reverse flows: the case of remanufacturing activities (Q850279) (← links)
- Performance evaluation of a multi-echelon production, transportation and distribution system: a matrix analytical approach (Q852979) (← links)
- Computing redundant resources for the resource constrained project scheduling problem (Q853022) (← links)
- Different behaviour of a double branch-and-bound algorithm on \(\mathrm {Fm}|\mathrm{prmu}|C_{\max}\) and \(\mathrm {Fm}|\mathrm {block}|C_{\max}\) problems (Q856670) (← links)
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches (Q857326) (← links)
- An integrated production and inventory model to dampen upstream demand variability in the supply chain (Q857368) (← links)
- An efficiency measurement framework for multi-stage production systems (Q863531) (← links)
- An exact method for \(Pm/sds, r_{i}/ \sum^{n}_{i=1} C_{i}\) problem (Q875429) (← links)
- Heuristic stability: a permutation disarray measure (Q883278) (← links)
- A reactive GRASP and path relinking for a combined production-distribution problem (Q883304) (← links)
- Partial solutions and multifit algorithm for multiprocessor scheduling (Q894528) (← links)
- Real-time scheduling to minimize machine busy times (Q906551) (← links)
- Flexible supply contracts under price uncertainty (Q930966) (← links)
- A note: Common due date assignment for a single machine scheduling with the rate-modifying activity (Q954028) (← links)
- Approximation results for flow shop scheduling problems with machine availability constraints (Q954036) (← links)
- High-multiplicity cyclic job shop scheduling (Q957353) (← links)
- Fuzzy hierarchical production planning (with a case study) (Q969557) (← links)
- A two-stage hybrid flowshop with uniform machines and setup times (Q969780) (← links)
- The integrality of the lot size in the basic EOQ and EPQ models: applications to other production-inventory models (Q972945) (← links)
- Online scheduling on unbounded parallel-batch machines to minimize the makespan (Q990962) (← links)
- Heuristics for capacity planning problems with congestion (Q1000984) (← links)
- Minimizing makespan in two-stage hybrid cross docking scheduling problem (Q1001000) (← links)
- Preemptive scheduling and antichain polyhedra (Q1003473) (← links)
- Optimal policy for an inventory system with backlogging and all-units discounts: Application to the composite lot size model (Q1011224) (← links)
- On-line scheduling with delivery time on a single batch machine (Q1022586) (← links)
- The flow shop problem with no-idle constraints: a review and approximation (Q1027525) (← links)
- Incentive and production decisions for remanufacturing operations (Q1037669) (← links)